To the central content area

The investigated project of groundwater and not clear dump on the address groundwater fluid matter in Ping-Tung country

Absrtact
The investigated project of groundwater and not clear dump on the address groundwater fluid matter in Ping-Tung country. The origin plans to start carry out after the category defined and had already completed all main works inside the project and the result summary as attach. The following aims at this team namely to complete at present of each work carry out a result one by one a synopsis explanat: The constitution work of the groundwater well, complete the well constitution, make up, the downstream well number maintains three people at least by with provide complete fluid matter data. The field place wells maintenance to maintain work, complete 17 wells in underground part maintenance to maintain before sample every season, ground the upper part cent maintain completion item to include high homework of the mat of 2 wells. The groundwater quality investigated work, Sample homework, and complete the analytical work of all samples in the completion well inside the provision term and 127 wells. complete to compare 17 field place wells and 110 wells with drinking water headwaters laws standard and the irrigation water fluid matter the standard. Add to measure the cation and anion to carry on the Piper illustrated manual table method, the method, the degree of hardness valuation of the irrigation water valuation and Simpson method valuation in the plentiful water period. The risk assessment of health, complete the risk assessment of health in Chih-Shan-Yen and Wan-Den. The survey of emergency response, complete returns the Kuei-Jen segment the pollution affairs soil in Ping-Tung City l and groundwater an identification homework, analyzing a result totally have two heavy metals in the soil grounds to have over the situation of the control standard, identify of two people the running water company the underground pump water well all low in control standard. Whole cure completion juniors to go recheck the sample inquisition, investigate a result low in monitor basis value. The gas station inspection work and measures to leak the tube examination, hold the laws explanation of the completion gas station to will there are 114s to attend meeting totally, and complete totally 133 stand two censuses. The adoption measures to explode the machine and PID to investigate 133 stations to complete 2036s to measure to leak tube function to test totally and the oil spirit work. The examination database of the soil groundwater, the examination database of the soil groundwater was built-completed, and also brought into the soil data in 1995~2004 and the data local area well in 1998~2004 in Ping-Tung. Carry out "the national soil and the groundwater pollution whole to cure business seminar", the seminar has hold in the meeting room of Ken-Din Hotel. 25 environmental protection bureaus have 23s to all send a member to attend in addition to seat personnel over 75 people, and get to attend a superior to praise.. Compile basic data of the district and 110 field places wells and changes a well lock, compile a result to join to dump on an address 17 people and the gas station 5 people's field to place sex well capital data and compile volume according to 2003, complete 110 people the well address fixed position of the coordinates in 97 and unify a well lock.
Keyword
Standard well、Cation and anion、Piper illustrated manual table method、Irrigation water valuation method、Degree of hardness valuation method、Simpson evaluate method
Open
top